There are various styles and models of HB high-power reducers, and the installation methods are also different. The correct installation method can be better used and effectively improve work efficiency, so that everyone can effectively understand the installation steps. Below, we will follow the HB high-power reducer manufacturer to learn today's content:

1. When installing transmission components on the output shaft, attention should be paid to gentle operation and rough installation with tools such as hammers is prohibited. The installation is carried out using assembly fixtures and internal threads of the end shaft, and the transmission components are pressed into the reducer with the force of bolt tightening, which can protect the internal parts from damage.

HB high-power reducer

2. When installing the HB high-power reducer, special attention should be paid to the alignment of the transmission center axis. The alignment error should not exceed the compensation amount of the coupling used in the reducer. After aligning according to the requirements, more ideal transmission effect and longer service life can be obtained.
3. There are multiple types of couplings to choose from, but do not use rigid fixed couplings as they are difficult to install. Improper installation can increase the load capacity, easily causing bearing damage and even output shaft fracture.
4. The trial operation time should not be less than two hours. The standard for normal operation is that it runs smoothly, without vibration, noise, leakage, or impact. If any abnormal situations occur, they should be promptly eliminated.
5. The installation position should ensure the convenience of the staff, including easy access to the cursor, vent plug, and drain plug. After installation, the inspector should check the accuracy of the installation position in sequence, determine the reliability of each fastener, etc. Before operation, it is also necessary to prepare for operation, remove the vent hole screw plug of the oil tank and replace it with a vent plug, open the oil level plug screw to check the oil line height, add lubricating oil beyond the oil level plug screw until the hole overflows, then screw on the oil level plug and confirm that it is correct before starting the trial operation.
6. The fixation of HB high-power reducer is very important to ensure stability and firmness. Generally speaking, it should be installed on a horizontal foundation or base, and the oil in the oil drain groove should be able to be discharged. The cooling air circulation should be smooth. Poor fixation and unreliable foundation can cause vibration and unnecessary damage to bearings and gears. Protective devices should be installed on the transmission connecting parts when necessary, such as protrusions on the connecting parts or the use of gears, sprockets, etc. If the output shaft bears a large radial load, a reinforced type should also be selected.
After gaining a certain understanding of the installation steps for HB high-power reducers through the above explanation, we still need to strictly follow the steps in order to help us maintain a good condition and be easy to repair in subsequent use.